‘The school and  I are extremely happy with the building design, workmanship and finishes. Each one of you with your specialisms have contributed to this’

Afshan Sohail – Head of Estates, UCS

‘Hollywell recently carried out the refurbishment of a large section of powder coated fencing at Arundel Railway Station. The quality of work was exceptional and the handback / O&M documentation was first class. I would recommend them to others without hesitation.’

Dave Waldock – Facilities Manager, Southern Coastal, Govia Thameslink Railway (GTR)

GTR logo

‘A massive thank you to the facilities department for pulling out all the stops and getting a badly damaged fence on Platform 1 Flitwick station repaired in less than 24 hours. Hollywell, our contractor, was on site in less than 2 hours to make sure the line was safe until the permanent fix was completed the following morning. This has been an amazing job, completed in such a short time frame, with no mess.’

Bernadette Lee – Station Manager at Bedford, Flitwick & Harlington Station and Colin Stewart- Station Facilities Manager

GTR logo