Hollywell Creates Two New Laboratories at Brunel University

Hollywell were tasked with creating two new laboratories and works to eight other rooms in Brunel Universities Gaskell Building.

The remit included the complete builders works, structural works and MEP services and was completed on time to a sixteen week schedule.

The value of the project was £850k and included all M&E services and decorations.

The full remit of the works included the following:

Roof Void Plant Works
Roof Plant Works
Electrical Works
Lighting and Dali Controls
Data
AV
Fire Alarm Works/Interfaces
Security Systems
Mechanical Ventilation/Fire Safety Controls
BMS/Metering Laboratories
LTHW Heating
Air Conditioning
Acoustic Works
Cat 5 Water/DHW
Public Health – Vulcathene Waste Systems
Laboratory Gas Installation including Gas Safety Systems
Fire Protection All Areas
Boiler Plant/Flue and Controls Replacement
BMS/Metering for Boilers
Flooring
Decorations
Testing and Commissioning all Services

Hollywell was able to hand over the project on time and to an exceptionally high standard of finish.