Activities during COVID
GTR Stations At the beginning of the COVID-19 outbreak, Hollywell were approached by GTR to flush their water systems at 83 stations which had been shut down. The Hollywell team … Continue reading Activities during COVID
GTR Stations At the beginning of the COVID-19 outbreak, Hollywell were approached by GTR to flush their water systems at 83 stations which had been shut down. The Hollywell team … Continue reading Activities during COVID
The provision of all planned and reactive maintenance to all electrical and mechanical systems to assets within the estate of the Cardinal Wiseman School in the London Borough of Ealing. … Continue reading The Cardinal Wiseman School Term Maintenance Contract
The refurbishment of an existing Grade 2 listed lodge building within the grounds of University College Senior School and the construction of a new brick built extension with structural glazed … Continue reading UCS Lodge Refurbishment