Activities during COVID
GTR Stations At the beginning of the COVID-19 outbreak, Hollywell were approached by GTR to flush their water systems at 83 stations which had been shut down. The Hollywell team … Continue reading Activities during COVID
TEL: 01727 810555
GTR Stations At the beginning of the COVID-19 outbreak, Hollywell were approached by GTR to flush their water systems at 83 stations which had been shut down. The Hollywell team … Continue reading Activities during COVID
Hollywell were tasked with painting and redecorating the majority of the stations on the Greater Anglia network. The works included painting booking halls, waiting rooms, canopies – both internally and … Continue reading Hollywell gives Greater Anglia Stations a fresh new look
Hollywell were commissioned to install a bespoke LED handrail for Limehouse Station, London E14. This challenging project was in collaboration with a specialist lighting fabricator and installed and connected by … Continue reading Hollywell installs Limehouse Station LED Handrail for C2C
The Brief : To replace pre-surveyed water supply pipework at nine railway stations following an increase in the number of pipework failures during cold weather.